TPM Consulting
23 man-days in the standard programme, scaled to the size of the plant and the number of lines.
3 Man-days · Focus-group and individual interviews, observation on the floor, and performance analysis to establish readiness before …
Open2 Man-days · Senior management must understand TPM well enough to set policy, structure and plan correctly — this workshop produces t…
Open3 Man-days · The pillar that lets operators care for their own equipment — the heart of TPM.…
Open5 Man-days · Everything beyond what the operator can do: BM, PM, CBM, CM and MP, plus spare-parts and maintenance-data management.…
Open10 Man-days · Coaching and advice on the floor so that TPM actually takes root and is sustained.…
OpenMost plants have done 5S. The results point in different directions, there is no standard, no continuity and no assessment. This programme puts objectives, method and measurement around it.
OpenA three man-day assessment ends with a readiness report, the weaknesses needing urgent attention, and a TPM plan.