Plant assessment · TPM · OEE · Lean · Industry 4.0

TPM Consulting

Autonomous Maintenance Handbook

The full handbook for production teams

The full handbook for the pillar that decides whether TPM works: CLAIR, abnormality tags, and all seven autonomous maintenance steps with the audit criteria for each gate.

What is inside

  • Building operator ownership of the machine
  • CLAIR: cleaning, lubrication, adjusting, inspecting, repair
  • The seven AM steps with a pass criterion for each
  • Abnormality tags and contamination-source countermeasures
  • Working with maintenance, and small-group activity

The full handbook for production teams · 220 pages · inquire for the full book

Book · 220 pages

Autonomous Maintenance

The full handbook for production teams

The full handbook for the pillar that decides whether TPM works: CLAIR, abnormality tags, and all seven autonomous maintenance steps with the audit criteria for each gate.

  • Building operator ownership of the machine
  • CLAIR: cleaning, lubrication, adjusting, inspecting, repair
  • The seven AM steps with a pass criterion for each
  • Abnormality tags and contamination-source countermeasures
  • Working with maintenance, and small-group activity

Inquire for the full 220-page book

Interested in the full 220-page book? Leave your name and email and the consultant or his team will get back to you personally to tell you more.

We use this only to reply to you. We do not sell or share your details.

Or talk to us directly: 081-918-9082 · admin@tpmconsulting.org

Thank you — we have your message

We will get back to you about the book shortly. Or call us on 081-918-9082.

Email admin@tpmconsulting.org

Start with a measured picture of your losses.

A three man-day assessment ends with a readiness report, the weaknesses needing urgent attention, and a TPM plan.

Request a Plant Assessment Inquire for the full 384-page book